The project
The Herrick Corporation and Hensel Phelps used Versatile at the Kaiser Permanente Riverside Hospital Expansion project.
Through this project, the team had set a new benchmark for steel beam installations with
- Single-Load installation times at 53% faster than the Versatile Steel Performance Index
- Two-Load installations at an impressive 55% faster than the Versatile Steel Performance Index
Overall, the Versatile Steel Performance Index noted delivery results of 31% faster than the average!